logo
ProjectClosed

Malton CC RTU Replacement Phase 2

The status, timeline and source of this project. A free account opens every field.

Source: Dodge USA

Without limiting the project scope, which is described in detail in the Contract Documents, the Work involves: Removal of existing HVAC-8? multi-zone rooftop heating/cooling units. Removal and replacement of all single zone RTUs as noted in the consultants? drawings and documents. Provide new roof top units as noted in the contract documents including ductwork, electrical, natural ga

Status
Closed
Sector
Natural Gas, Education, Power Generation (CCGT), Government, Commercial, Manufacturing (Industrial)
Location
Mississauga, Ontario, Canada
Updated
22 Jul 2026
Source
Dodge USA

ConstructChat

Ask ConstructChat about Malton CC RTU Replacement Phase 2

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Malton CC RTU Replacement Phase 2” is an infrastructure initiative in the Natural Gas sector, located in Mississauga, Ontario, Canada. Taiyo aggregates data on it from Dodge USA.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Without limiting the project scope, which is described in detail in the Contract Documents, the Work involves: Removal of existing `HVAC-7? and `HVAC-8? multi-zone rooftop heating/cooling units. Removal and replacement of all single zone RTUs as noted in the consultants? drawings and documents. Provide new roof top units as noted in the contract documents including ductwork, electrical, natural gas, BAS integration, structural and roof work. Provision for temporary cooling/heating as required...

Procurement method

Budget

Location

Country

Canada

State

Ontario

City

Mississauga

Source

Source

Dodge USA

URL

More Details

Record type

Project

Sector

Natural Gas, Education, Power Generation (CCGT), Government, Commercial, Manufacturing (Industrial)

Article published date

2024-02-22

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project