logo
ProjectOngoing

Mambilla Power Project Arbitration

Ongoing · Taraba · Last reported Jan 2025

Source: Arise News

The Mambilla Power Project involves a $6 billion arbitration case concerning allegations of contract breaches by Nigeria. Key figures, including former Presidents Obasanjo and Buhari, are testifying in Paris regarding the project awarded in 2003 for the construction of a 3,960MW hydroelectric power station.

Status
Under Construction
Sector
Power Generation (CCGT)
Location
Taraba, Nigeria
Updated
22 Jul 2026
Source
Arise News

ConstructChat

Ask ConstructChat about Mambilla Power Project Arbitration

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “Mambilla Power Project Arbitration” is an infrastructure initiative in the Power Generation (CCGT) sector, located in Taraba, Nigeria. Taiyo aggregates data on it from Arise News.

Participants

Company

Status

Original status

Ongoing

Taiyo status

Under Construction

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The Mambilla Power Project involves a $6 billion arbitration case concerning allegations of contract breaches by Nigeria. Key figures, including former Presidents Obasanjo and Buhari, are testifying in Paris regarding the project awarded in 2003 for the construction of a 3,960MW hydroelectric power station.

Original sector

Energy

Budget

Location

Country

Nigeria

State

Taraba

Source

Source

Arise News

URL

More Details

Record type

Project

Sector

Power Generation (CCGT)

Article published date

2025-01-21

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project