Mammoth Power Cable between Australia and New Zealand
Sector: Power Generation (CCGT) • Location: Australia
Source: Energy News Bulletin
A $10.85 billion plan to construct a 2,600km submarine high-voltage direct current cable connecting the Australian and New Zealand power grids is being proposed. The project is initiated by a new venture called TasLink, established by directors Richard Homewood and John Telfer.
- Status
- Prospective
- Sector
- Power Generation (CCGT), Power Transmission
- Location
- Australia
- Updated
- 22 Jul 2026
- Source
- Energy News Bulletin
ConstructChat
Ask ConstructChat about Mammoth Power Cable between Australia and New Zealand
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | planned |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | A $10.85 billion plan to construct a 2,600km submarine high-voltage direct current cable connecting the Australian and New Zealand power grids is being proposed. The project is initiated by a new venture called TasLink, established by directors Richard Homewood and John Telfer. |
Budget |
Location
Country | Australia |
Source
Source | Energy News Bulletin |
URL |
More Details
Record type | Project |
Sector | Power Generation (CCGT), Power Transmission |
Article published date | 2025-03-07 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
