Manchester Reservoir Dam Rehabilitate Phase 1A
The status, timeline and source of this project. A free account opens every field.
Source: Dodge
This capital project entails engineering design services for the preparation of a seepage analysis, including dewatering and toe drain work, to eliminate any leaks. The engineering services will also include surveying, permitting, bidding, as well as general project management and resident engineering during construction. The dam has been seeping for some time. Eliminating seepage would increase t
- Status
- Prospective
- Sector
- Water Supply and Storage, Hydro, Government, Waste Processing and Treatment, Commercial
- Location
- Attleboro, Massachusetts, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Manchester Reservoir Dam Rehabilitate Phase 1A
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Pre-Design |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | This capital project entails engineering design services for the preparation of a seepage analysis, including dewatering and toe drain work, to eliminate any leaks. The engineering services will also include surveying, permitting, bidding, as well as general project management and resident engineering during construction. The dam has been seeping for some time. Eliminating seepage would increase the storage volume of Manchester Reservoir. City of Attleboro maybe seeking Design for This capita... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Massachusetts |
City | Attleboro |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Hydro, Government, Waste Processing and Treatment, Commercial |
Article published date | 2025-04-07 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
