logo
ProjectPlanned

Manesar Fresh Waste Processing Project

One of 4,900 projects Taiyo tracks in Haryana.

Source: The Times of India

The Municipal Corporation of Manesar (MCM) initiated the process to hire a private agency for fresh waste processing in Manesar. The project is a stop-gap arrangement to ensure that waste does not pile up, with the agency hired for three months. The project involves processing municipal solid waste generated daily, estimated at 230 to 250 tonnes. A new weigh bridge has been installed and will be o

Status
Prospective
Sector
Waste Processing and Treatment, Biomass, Bridge, Government
Location
Gurgaon, Haryana, India
Updated
22 Jul 2026
Source
The Times of India

ConstructChat

Ask ConstructChat about Manesar Fresh Waste Processing Project

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Manesar Fresh Waste Processing Project” is an infrastructure initiative in the Waste Processing and Treatment sector, located in Gurgaon, Haryana, India. Taiyo aggregates data on it from The Times of India.

Participants

Not available for this record.

Status

Original status

planned

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The Municipal Corporation of Manesar (MCM) initiated the process to hire a private agency for fresh waste processing in Manesar. The project is a stop-gap arrangement to ensure that waste does not pile up, with the agency hired for three months. The project involves processing municipal solid waste generated daily, estimated at 230 to 250 tonnes. A new weigh bridge has been installed and will be operational from May 1 to ascertain the actual quantity of waste generated daily.

Original sector

Municipal Solid Waste Management

Budget

Location

Country

India

State

Haryana

City

Gurgaon

Source

Source

The Times of India

URL

More Details

Record type

Project

Sector

Waste Processing and Treatment, Biomass, Bridge, Government

Article published date

2026-05-01

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project