Mangini Ranch Class I Trails
Closed · California · Last reported Jul 2025
Source: Dodge
This project is located in the City of Folsom, Sacramento County, within the community of Mangini Ranch located in the Folsom Plan Area. The work to be done is shown on the plans, and generally consists of, but is not limited to, furnishing all labor, materials, and equipment to construct approximately 2.3 miles of Class I trails on existing rough graded alignments as shown on the plans. This incl
- Status
- Closed
- Sector
- Waste Processing and Treatment, Water Supply and Storage, Mass Transit, Rail, Car parking, Automotive, Commercial, Government
- Location
- Folsom, California, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Mangini Ranch Class I Trails
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | This project is located in the City of Folsom, Sacramento County, within the community of Mangini Ranch located in the Folsom Plan Area. The work to be done is shown on the plans, and generally consists of, but is not limited to, furnishing all labor, materials, and equipment to construct approximately 2.3 miles of Class I trails on existing rough graded alignments as shown on the plans. This includes but is not limited to all trenching and backfilling; all piping; all paving, retaining walls... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | California |
City | Folsom |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Waste Processing and Treatment, Water Supply and Storage, Mass Transit, Rail, Car parking, Automotive, Commercial, Government |
Article published date | 2025-07-14 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Waste Processing and Treatment projects in United States of America
- JACK FOUNTAIN/HOLLOWAY RAY FM SNOWHILL CHURCH TO BRANCH
- West lake sammamish parkway phase 2
- 228th St. SE Roadway Repair near 15th Ave. SE
- Camden Lift Station
- REPLACE EXIST. CONVIENENCE STORE W/ NEW ONE, UPGRADE LANDSCA PE, SITE LIGHTING, DRAINAGE. ADD STARBUCKS DRIVETHRU W/ SPR
- PHASED APPROVAL FOR 1) METAL FRAMING & SHEETROCK & 2) 3 UNDE R SLAB DRAINS. REFER TO MAIN PERMIT 202205223
- (N) COMMERICAL SINKS: 3-COMPARTMENT SINK AND 2 ADDITIONAL SINKS WITH DRAINAGE AND WATER.
- NEW ADA BATHROOM PER PLAN AND SPECIFICATIONS AREA 66SF SCREE NED. (N) 4" SEWER LATERAL CONNECTION, (N) WATER FOUNDATION
