Mangrove Lithium Second Commercial Lithium Processing Facility
Sector: Energy Storage • Location: Canada
Source: Electric Autonomy Canada
Mangrove Lithium plans to build a second, much larger lithium processing plant in eastern Canada, expected to begin construction in 2027 and come online in 2028. This facility will have a production capacity of 20,000 tonnes per annum of battery-grade lithium hydroxide, enough to power over 500,000 electric vehicles annually, and will include spodumene-processing capability.
- Status
- Prospective
- Sector
- Energy Storage, Electric Vehicles (EVs), Automotive, Power Generation (CCGT), Warehouse, Commercial
- Location
- Canada
- Updated
- 22 Jul 2026
- Source
- Electric Autonomy Canada
ConstructChat
Ask ConstructChat about Mangrove Lithium Second Commercial Lithium Processing Facility
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | planned |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Mangrove Lithium plans to build a second, much larger lithium processing plant in eastern Canada, expected to begin construction in 2027 and come online in 2028. This facility will have a production capacity of 20,000 tonnes per annum of battery-grade lithium hydroxide, enough to power over 500,000 electric vehicles annually, and will include spodumene-processing capability. |
Original sector | EV Supply Chain |
Location
Country | Canada |
Source
Source | Electric Autonomy Canada |
URL |
More Details
Record type | Project |
Sector | Energy Storage, Electric Vehicles (EVs), Automotive, Power Generation (CCGT), Warehouse, Commercial |
Article published date | 2025-09-16 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Energy Storage projects in Canada
- Transition to Zero-Emission Buses
- Fundy Trail Development Authority Inc.Hearst Lodge solar power and battery storage energy conversion
- Conventional Vehicle Replacement
- North West Redwater Sturgeon Bitumen Refinery, Alberta
- Canyon Creek Pumped Hydro Energy Storage Project
- Electric Vehicle Battery Cell Plant (Volkswagen Group)
- Hybrid Buses Rehabilitation
- Aura Peace Butte Solar
