Manhattan Tunnel Project
The owner, status and timeline of this project. A free account opens every field.
Source: TipRanks
The Manhattan Tunnel Project is a design-build contract awarded to a joint venture between Tutor Perini and Frontier-Kemper Constructors. It involves the construction of twin 30-foot diameter tunnels approximately 700 feet in length beneath the eastern shore of the Hudson River, as part of the larger Hudson Tunnel Project aimed at improving rail infrastructure between New York and New Jersey.
- Status
- Closed
- Sector
- Rail, Tunnel, Government
- Location
- New York, United States of America
- Updated
- 22 Jul 2026
- Source
- TipRanks
ConstructChat
Ask ConstructChat about Manhattan Tunnel Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency | |
Company |
Status
Original status | Awarded |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Manhattan Tunnel Project is a design-build contract awarded to a joint venture between Tutor Perini and Frontier-Kemper Constructors. It involves the construction of twin 30-foot diameter tunnels approximately 700 feet in length beneath the eastern shore of the Hudson River, as part of the larger Hudson Tunnel Project aimed at improving rail infrastructure between New York and New Jersey. |
Original sector | Transportation |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | New York |
City | New York |
Source
Source | TipRanks |
URL |
More Details
Record type | Project |
Sector | Rail, Tunnel, Government |
Article published date | 2025-02-14 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
