Manhattan Verdi Square Renovation
Sector: Water Supply and Storage • Location: New York, United States of America
Source: Dodge
The primary goals of the project include the installation of an asphalt path to create an accessible route within the square, upgrades to the water service, and the installation of a Reduced Pressure Zone (RPZ) back flow device for improved water management. Work will introduce a new asphalt walkway with steel edging to improve pedestrian movement within the park. The existing granite curb will be
- Status
- Prospective
- Sector
- Water Supply and Storage, Government, Steel, Road, Commercial, Waste Processing and Treatment, Car parking, Metal, Manufacturing (Industrial), Automotive
- Location
- New York, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Manhattan Verdi Square Renovation
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Planning Schematics |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The primary goals of the project include the installation of an asphalt path to create an accessible route within the square, upgrades to the water service, and the installation of a Reduced Pressure Zone (RPZ) back flow device for improved water management. Work will introduce a new asphalt walkway with steel edging to improve pedestrian movement within the park. The existing granite curb will be adjusted to accommodate this addition. Additionally, two quick couplers will be installed to enh... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | New York |
City | New York |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Government, Steel, Road, Commercial, Waste Processing and Treatment, Car parking, Metal, Manufacturing (Industrial), Automotive |
Article published date | 2025-03-31 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
