Manhole Cleaning Solution
Sector: Manufacturing (Industrial) • Location: Bengaluru Urban, Karnataka, India
Source: India Investment Grid (IIG)
In the past it has been customary to scoop out human waste and other debris collected at the bottom of sanitary manhole basins by a so called desilting operation using hand buckets or scoops on long poles. Such desilting tools and methods of operation are inefficient, requires manual operations that could have an impact on the health of maintenance crew, and is also an kind of work that is increas
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | unfunded |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | In the past it has been customary to scoop out human waste and other debris collected at the bottom of sanitary manhole basins by a so called desilting operation using hand buckets or scoops on long poles. Such desilting tools and methods of operation are inefficient, requires manual operations that could have an impact on the health of maintenance crew, and is also an kind of work that is increasingly sought to be eliminated from a social welfare perspective. 2019 saw the highest number of manual scavenging deaths in the past five years- 110 workers were killed while cleaning sewers and septic tanks. This project is aimed at eradicating the manual scavenging process, i.e literally remove man from manhole at all costs. The project is in active development by a team of Product Design & Engineering Team at SID, Indian Institute of Science [IISc] under the guidance of professors, and mentors from Society for Innovation & Development [SID], IISc. The design & development has happened over an year and currently a third functional prototype has been designed and tested. The fund would be used to improve the functionality, usability and aesthetics of the current desilting machine prototype through strategic design and automation. Manufacturing & Production facilities, Human Resource, Equipments & Marketing support is required for the same. Also, the fund would be used for Pilot production and testing. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
