Manila-Makati-Pasay-Parañaque mass transit system PPP project
Sector: Residential • Location: Philippines
Source: InfraPPPWorld
The project involves the development of a mass transit system which would connect the Metro Rail Transit Line 3 and Light Rail Transit system in Metro Manila. The proposed alignment starts in the C5-32nd roadway in Taguig City and will pass through the Makati City central building district, the LRT1 Buendia station going to the CCP Complex and Mall of Asia and end at Edsa corner Ayala Ave.
- Status
- Prospective
- Sector
- Residential, Rail, Commercial, Mass Transit
- Location
- Philippines
- Updated
- 19 Nov 2026
- Source
- InfraPPPWorld
ConstructChat
Ask ConstructChat about Manila-Makati-Pasay-Parañaque mass transit system PPP project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | project in planning |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | The project involves the development of a mass transit system which would connect the Metro Rail Transit Line 3 and Light Rail Transit system in Metro Manila. The proposed alignment starts in the C5-32nd roadway in Taguig City and will pass through the Makati City central building district, the LRT1 Buendia station going to the CCP Complex and Mall of Asia and end at Edsa corner Ayala Ave. |
Original sector | Transport |
Procurement method | |
Budget |
Location
Country | Philippines |
Source
Source | InfraPPPWorld |
URL |
More Details
Record type | Project |
Sector | Residential, Rail, Commercial, Mass Transit |
Article published date | 2025-02-24 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
