Manistee Gateway Mixed-use Development PH 2
Pre-design · Michigan · Last reported Feb 2025
Source: Dodge
The second phase would add a yet-to-be-branded 97-unit condominium hotel and 150-person capacity conference center in a building on the north side of the street overlooking the Manistee River. That facility also will feature a pool, fitness center, restaurant, garden-level and rooftop bars, and a Native American heritage and historic center.
- Status
- Prospective
- Sector
- Consumer Products, Road, Hotel, Raw Materials, Commercial
- Location
- Manistee, Michigan, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Manistee Gateway Mixed-use Development PH 2
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Pre-Design |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The second phase would add a yet-to-be-branded 97-unit condominium hotel and 150-person capacity conference center in a building on the north side of the street overlooking the Manistee River. That facility also will feature a pool, fitness center, restaurant, garden-level and rooftop bars, and a Native American heritage and historic center. |
Budget |
Location
Country | United States of America (USA) |
State | Michigan |
City | Manistee |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Consumer Products, Road, Hotel, Raw Materials, Commercial |
Article published date | 2025-02-10 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Consumer Products projects in United States of America
- MIDTOWN CONNECTOR IMPROVEMENTS
- 98th avenue se (97th place se) and se 11th street slope stabilization
- REMOVE AND REPLACE FENCE, INSTALL ANTENNAS, POWER TRUNKS, RECTIFIERS, BREAKER AND BATTERY STRINGS
- CONVERT (E) DETACHED PERMITTED WORKSHOP INTO NEW ADU, INSTALL (N) FURNACE & TANKLESS W.H,RELOCATE (E)100A SUBPANEL
- WMATA Orange and Blue Line Rehabilitation
- Lake Nona Middle School
- Armature Works
- Anaheim Regional Transportation Intermodal Center
