Mannar Power Line Project
Sector: Wind • Location: Mannar, Sri Lanka
Source: Newswire
Construction of a 28-kilometre, 220kV double-circuit transmission line from the Mannar Grid Substation to the Mullikulam Collector Grid Substation under Lot 0 of the Mullikulam Wind Power Transmission Project.
- Status
- Closed
- Sector
- Wind, Power Generation (CCGT)
- Location
- Mannar, Sri Lanka
- Updated
- 22 Jul 2026
- Source
- Newswire
ConstructChat
Ask ConstructChat about Mannar Power Line Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | awarded |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Construction of a 28-kilometre, 220kV double-circuit transmission line from the Mannar Grid Substation to the Mullikulam Collector Grid Substation under Lot 0 of the Mullikulam Wind Power Transmission Project. |
Original sector | Energy |
Budget |
Location
Country | Sri Lanka |
City | Mannar |
Source
Source | Newswire |
URL |
More Details
Record type | Project |
Sector | Wind, Power Generation (CCGT) |
Article published date | 2026-03-20 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
