Mannar–Mullikulam 220kV Double-Circuit Transmission Line Project
One of 10,000+ projects Taiyo tracks in Sri Lanka.
Source: ET Manufacturing
The project involves constructing the Mannar–Mullikulam 220kV double-circuit transmission line to evacuate power generated by the Mullikulam Wind Power Projects to Sri Lanka's national grid. It aims to develop the transmission infrastructure required to support Sri Lanka's renewable energy ambitions and clean energy transition.
- Status
- Closed
- Sector
- Wind, Power Generation (CCGT), Manufacturing (Industrial), Power Transmission
- Location
- Sri Lanka
- Updated
- 22 Jul 2026
- Source
- ET Manufacturing
ConstructChat
Ask ConstructChat about Mannar–Mullikulam 220kV Double-Circuit Transmission Line Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | awarded |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The project involves constructing the Mannar–Mullikulam 220kV double-circuit transmission line to evacuate power generated by the Mullikulam Wind Power Projects to Sri Lanka's national grid. It aims to develop the transmission infrastructure required to support Sri Lanka's renewable energy ambitions and clean energy transition. |
Original sector | Energy |
Location
Country | Sri Lanka |
Source
Source | ET Manufacturing |
URL |
More Details
Record type | Project |
Sector | Wind, Power Generation (CCGT), Manufacturing (Industrial), Power Transmission |
Article published date | 2026-05-17 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
