Mantaro-Marcona-Socabaya-Montalvo Transmission Line
Active · Peru
Source: World Bank Group
In July 2013, Colombian company Interconexion Electrica (ISA), through its subsidiary Consorcio Supervisor Transmantaro (CST), was awarded the contract to design, finance, construct, operate and maintain Mantaro-Marcona-Socabaya-Montalvo (MAMO) 920-km transmission line at the Huancavelica, Ica, Arequipa and Moquegua districts (500kv).
Besides CST, two other bidders took part in the process: ASA I
- Status
- Prospective
- Sector
- Power Generation (CCGT), Commercial, Government
- Location
- Peru
- Updated
- 22 Jul 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about Mantaro-Marcona-Socabaya-Montalvo Transmission Line
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency | |
Company |
Status
Original status | Active |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | In July 2013, Colombian company Interconexion Electrica (ISA), through its subsidiary Consorcio Supervisor Transmantaro (CST), was awarded the contract to design, finance, construct, operate and maintain Mantaro-Marcona-Socabaya-Montalvo (MAMO) 920-km transmission line at the Huancavelica, Ica, Arequipa and Moquegua districts (500kv). Besides CST, two other bidders took part in the process: ASA Iberoamerica S.A and Consorcio Redes Energeticas Nacionais. The bidding criteria was the lowest annual revenue. The sponsor signed a 30-year concession contract with the Peruvian Energy and Mines Ministry in September 2013. The sponsor committed to invest US$ 447 million in the project. Financial closure took place in March 2015 when a US$ 250 million credit agreement was arranged by Banco de Crédito del Perú to finance five CST projects in the country, including the Mantaro-Marcona-Socabaya-Montalvo transmission line. Environmental clearance was granted in November 2015. Construction works commenced in the same month, and operations were expected to commence in 2017. As of August 2016, 75% of the construction works had been concluded. |
Original sector | Energy |
Procurement method | |
Budget |
Location
Country | Peru |
Source
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Power Generation (CCGT), Commercial, Government |
Article published date | 2024-05-17 |
Research
Free account
View all details