In January 1998, ProInversion, the Peruvian privatization agency, granted to Consorcio Transmantaro a 33 year contract to design, build and operate a 750-kilometer, 300 MW transmission line to link Peru's northern and southern electricity grids (Etecen and Etesur respectively). The line was to stretch from the power station in Mantaro (East of Lima), to Socabaya, near Arequipa in southern Peru.

Project Information FAQ

Project Information

5 Q
The project “Mantaro-Socabaya Transmission Line” is an infrastructure initiative in the Hydro sector, located in Peru. Taiyo aggregates data on it from World Bank Group.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

Active

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

In January 1998, ProInversion, the Peruvian privatization agency, granted to Consorcio Transmantaro a 33 year contract to design, build and operate a 750-kilometer, 300 MW transmission line to link Peru's northern and southern electricity grids (Etecen and Etesur respectively). The line was to stretch from the power station in Mantaro (East of Lima), to Socabaya, near Arequipa in southern Peru. The contract was granted through an international competitive tender in which three qualified bidders submitted final bids. Consorcio Transmataro won the contract by offering the lowest construction and operation cost: US$179 million. The other bidders offered US$242.4 million (Italian Enel) and US$243 million (British National Grid Company). The contract with Consorcio Transmataro was signed in Febreary 1998 and construction work began soon. The transmission line became operational in October 2000. Initially Consorcio Transmataro was owned by Canadian Hydro-Quebec (80%) and Peruvian Grana y Montero (5%) while state-owned Etecen held a 15% stake. The latter share was required by the BOT contract. In early 2006, a joint venture between Colombian Interconexion Electrica SA (ISA) and Empresa de Energia de Bogata (EEB) bought Hydro-Quebec and Grana y Montero shares in Consorcio Transmataro. In mid 2006, ProInversion sold Etecen’s 15% stake in the project through a public tender to Consorcio Transmataro for US $17.7 million. By end of 2006, ISA owned 60% of the shares in Consorcio Transmataro and EEB 40%. Update on sponsors in 2006. See filing system None

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data