Map Ta Phut LNG Regasification Terminal, Thailand

Sector: Chemical (Industrial) • Location: Thailand

Source: Hydrocarbon Technology

Project
Closed

The world price of energy is increasing constantly and Map Ta Phut (220km southeast of Bangkok) is an example of an LNG regasification facility being built by a country hedging its bets (not wanting to be left behind in the rush for natural gas). The project is being developed by PTT LNG Company Ltd (PTTLNG), a subsidiary of PTT Thai National Petro Chemical Company. The demand for liquid natural g

Project Information FAQ

Project Information

4 Q
The project “Map Ta Phut LNG Regasification Terminal, Thailand” is an infrastructure initiative in the Chemical (Industrial) sector, located in Thailand. Taiyo aggregates data on it from Hydrocarbon Technology.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

closed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The world price of energy is increasing constantly and Map Ta Phut (220km southeast of Bangkok) is an example of an LNG regasification facility being built by a country hedging its bets (not wanting to be left behind in the rush for natural gas). The project is being developed by PTT LNG Company Ltd (PTTLNG), a subsidiary of PTT Thai National Petro Chemical Company. The demand for liquid natural gas and, in turn, for new LNG ports is rising rapidly. In addition the facility is being constructed near to the Map Ta Phut industrial complex where a number of industries are setting up plants that may require natural gas feedstock. Industries here include petrochemical, refinery, steel, fertiliser plant and plants under construction by GS E&C include Aromatics No.2 (aromatics plant) and HMC PP (Line-3) (polypropylene). In February 2008 PTT plc was in talks with the Egco Group and the Electricity Generating Authority of Thailand (Egat) to form a new consortium to run the new $930m LNG project. This follows an agreement made previously in 2006. PTTLNG will expect to retain around a 45% share of the project. The new facility will involve the development of a deepwater port, a five-million-ton regasification (vaporiser) train with two 160,000m³ LNG storage tanks, a jetty, a boil-off gas recondensor, a send-out station and an LNG pump. The terminal is scheduled to start operating in 2011 (construction completed by June 2011). Phase two of the project, which is already being considered, will add a further LNG tank of 160,000m³ and also a further jetty (7.5 million tons capacity). The phase three proposals could involve a further jetty and another LNG tank of 160,000m³ (ten million tons capacity). PTTLNG failed to come to agreement for a supply contract from the Iranian Pars field for three million tons of LNG a year for 20 years and this has delayed the regasification terminal project to some extent. However in February 2008 PTT signed an agreement with Qatargas Operating Co. in Doha to purchase one million tons of LNG a year with delivery to start in early 2011 over a ten-year period (there is also an option for a further one million tons if required). Negotiations are also underway with LNG suppliers in Indonesia, Australia and the Middle East to fill the full five-million-tons-a-year capacity of the new facility. Natural gas actually already accounts for two-thirds of the fuel used to generate Thailand’s electricity, and the development of new sources has been deemed critical for the establishment of long-term energy security. DREDGING In December 2007 Van Oord was awarded a contract worth €53m for dredging work in Map Ta Phut on the east coast of Thailand. The project started in January 2008 and is scheduled to be completed in April 2009. The dredging project involves broadening and extending the port entrance to take the new large gas tankers (around five million cubic metres of dredging work), removing silt layers, and also reclaiming land for the LNG terminal development. There will also be a need for the construction of an access route and dykes. Van Oord has deployed a cutter suction dredger on the project. OTHER CONTRACTORS Construction has already started in 2008 and although not all of the contracts have gone out to tender yet there are some major engineering companies involved in the project. These include the project managing Korean E&C consortium consisting of GS E&C (Engineering and Construction – putting up $390m finance towards the project), Korea Gas Corp, Hanyang Corp and Daewoo Eng.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data