Maple Creek Drainage Pump Station - Intake # 2
Sector: Waste Processing and Treatment • Location: British Columbia, Canada
Source: Infrastructure Canada
The Maple Creek Integrated Watershed Management Plan recommended upgrading of the Pump station to address capacity, condition, access and fish passage issues. Maple Creek discharges to the Coquitlam River through the Maple Creek Drainage Pump Station and flood box. The pump station was constructed in 1990 and is currently in poor condition with electrical code and access issues.The existing pumps
- Status
- Prospective
- Sector
- Waste Processing and Treatment, Government
- Location
- British Columbia, Canada
- Updated
- 22 Jul 2026
- Source
- Infrastructure Canada
ConstructChat
Ask ConstructChat about Maple Creek Drainage Pump Station - Intake # 2
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | pre-construction |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Maple Creek Integrated Watershed Management Plan recommended upgrading of the Pump station to address capacity, condition, access and fish passage issues. Maple Creek discharges to the Coquitlam River through the Maple Creek Drainage Pump Station and flood box. The pump station was constructed in 1990 and is currently in poor condition with electrical code and access issues.The existing pumps are inadequate to convey the creek flow and 200-year storm flows from Maple Creek to the Coquitlam River, and do not provide flood protection for climate change impacts such as increased rain fall and sea level rise. Additionally, the current configuration does not permit fish passage when the pumps are operating. |
Original sector | Climate Resilience |
Budget |
Location
Country | Canada |
State | British Columbia |
Source
Source | Infrastructure Canada |
URL |
More Details
Record type | Project |
Sector | Waste Processing and Treatment, Government |
Article published date | 2025-06-04 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Waste Processing and Treatment projects in Canada
- Highway Rehab -- Bridge replacement Holland Drainage Canal, Bradford-West Gwillimbury
- Highway Rehab -- Resurfacing, Culvert rehabilitation, Drainage improvements Haldimand Rd. 56 to Dunnville west limits, and east limit of Dunnville to West/Central Boundary Haldimand County
- Highway Rehab -- Culvert rehabilitation Morris Drain Culvert, Lambton County
- Kirby In-Situ Oilsands Steam Assisted Gravity Drainage Buildings
- Southeast Personal Care Home
- Stonewall Woodlands Regional Water Supply
- Wastewater Lagoon Upgrades
- Russell Lagoon Upgrade
