Maple Energy Ethanol Co-generation Facility

Sector: Power Generation (CCGT) • Location: Peru

Source: World Bank Group

Project
Active

Maple Energy Ethanol Co-generation Facility included an ethanol plant, a sugarcane plantation, construction of a 37-megawatt electricity cogeneration plant to supply power for operations, and 60-kilovolt electric transmission line to connect the Ethanol Project facilities to Peru's national power grid. The project was located the department of Piura in Peru's northern coast. The plant was to burn

Status
Prospective
Sector
Power Generation (CCGT), Raw Materials, Government
Location
Peru
Updated
22 Jul 2026
Source
World Bank Group

ConstructChat

Ask ConstructChat about Maple Energy Ethanol Co-generation Facility

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “Maple Energy Ethanol Co-generation Facility” is an infrastructure initiative in the Power Generation (CCGT) sector, located in Peru. Taiyo aggregates data on it from World Bank Group.

Participants

Sponsoring Agency

Status

Original status

active

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Maple Energy Ethanol Co-generation Facility included an ethanol plant, a sugarcane plantation, construction of a 37-megawatt electricity cogeneration plant to supply power for operations, and 60-kilovolt electric transmission line to connect the Ethanol Project facilities to Peru's national power grid. The project was located the department of Piura in Peru's northern coast. The plant was to burn sugarcane waste from the ethanol distillation process to provide 100 percent of the project´s electricity needs, and enable Maple Etanol to sell excess electricity to Peru’s interconnected power system which was estimated to be approximately 17 MW of installed capacity or 46% of the plant's output. The total project cost of the ethanol plant, the co-generation plant and associated facilities was US $254 million. The total project cost of the co-generation facility was estimated at US $74 million based on a ratio of 2 million per MW associated with renewables. In December 2010, the Maple Energy Ethanol Co-generation Facility reached financial closure. Financing comprised a US $25 million loan from the Inter-American Development Bank,the Andean Development Corporation (CAF) was to finance $65 million, and the Entrepreneurial Development Bank of the Netherlands (FMO) was to finance $25 million, and a US$25 million senior secured construction and term loan with Banco Internacional del Peru (“Interbank”) The IADB loan was to have a term of 12.5 years, with a 2.5-year grace period. The interest rate was to be LIBOR plus a differential or the fixed-rate equivalent. Operations commenced in August 2012. Investment in the generation portion is an estimate based on a 2 million per MW ratio generally found in renewables per the finance team.

Original sector

Energy

Budget

Location

Country

Peru

Source

Source

World Bank Group

URL

More Details

Record type

Project

Sector

Power Generation (CCGT), Raw Materials, Government

Article published date

2024-06-01

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project