Maple Energy Ethanol Co-generation Facility

Sector: Power Generation (CCGT) • Location: Piura, Peru

Source: World Bank Group

Project
Active

Maple Energy Ethanol Co-generation Facility included an ethanol plant, a sugarcane plantation, construction of a 37-megawatt electricity cogeneration plant to supply power for operations, and 60-kilovolt electric transmission line to connect the Ethanol Project facilities to Peru's national power grid. The project was located the department of Piura in Peru's northern coast. The plant was to burn

Project Information FAQ

Project Information

5 Q
The project “Maple Energy Ethanol Co-generation Facility” is an infrastructure initiative in the Power Generation (CCGT) sector, located in Piura, Peru. Taiyo aggregates data on it from World Bank Group.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

active

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

Maple Energy Ethanol Co-generation Facility included an ethanol plant, a sugarcane plantation, construction of a 37-megawatt electricity cogeneration plant to supply power for operations, and 60-kilovolt electric transmission line to connect the Ethanol Project facilities to Peru's national power grid. The project was located the department of Piura in Peru's northern coast. The plant was to burn sugarcane waste from the ethanol distillation process to provide 100 percent of the project´s electricity needs, and enable Maple Etanol to sell excess electricity to Peru’s interconnected power system which was estimated to be approximately 17 MW of installed capacity or 46% of the plant's output. The total project cost of the ethanol plant, the co-generation plant and associated facilities was US $254 million. The total project cost of the co-generation facility was estimated at US $74 million based on a ratio of 2 million per MW associated with renewables. In December 2010, the Maple Energy Ethanol Co-generation Facility reached financial closure. Financing comprised a US $25 million loan from the Inter-American Development Bank,the Andean Development Corporation (CAF) was to finance $65 million, and the Entrepreneurial Development Bank of the Netherlands (FMO) was to finance $25 million, and a US$25 million senior secured construction and term loan with Banco Internacional del Peru (“Interbank”) The IADB loan was to have a term of 12.5 years, with a 2.5-year grace period. The interest rate was to be LIBOR plus a differential or the fixed-rate equivalent. Operations commenced in August 2012. Investment in the generation portion is an estimate based on a 2 million per MW ratio generally found in renewables per the finance team.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data