Maple ES Secure Vestibule
The status, timeline and source of this project. A free account opens every field.
Source: Dodge USA
This contract includes ALL work indicated on the attached Contract Documents including all architectural, mechanical, plumbing, and electrical work. Furnish and install new interior vestibule doors and glass in hollow metal frame. This includes all door hardware (including electrified hardware) and support framing above existing GWB soffit/ceilings or suspended acoustic tile ceiling where occurs.
- Status
- Closed
- Sector
- Metal, Power Generation (CCGT), Government, Commercial, Education
- Location
- Cambridge, Maryland, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Maple ES Secure Vestibule
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | This contract includes ALL work indicated on the attached Contract Documents including all architectural, mechanical, plumbing, and electrical work. Furnish and install new interior vestibule doors and glass in hollow metal frame. This includes all door hardware (including electrified hardware) and support framing above existing GWB soffit/ceilings or suspended acoustic tile ceiling where occurs. Furnish and install new pass-through window from new vestibule to administration area. New passth... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Maryland |
City | Cambridge |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Metal, Power Generation (CCGT), Government, Commercial, Education |
Article published date | 2024-04-22 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Metal projects in United States of America
- STRUCTURAL STEEL FABRICATION AND ERECTION
- SR 7; SR 91 & SR 520 @ 4 LOCS - BRIDGE PRESERVATION
- SR 83 @ SHOAL CREEK
- Annenberg Science Complex - James M. Rosser Hall [027B-ASCR]
- ADD NEW PRE-FAB STEEL GARAGE 780SQ FT SHARES PLANS WITH 202104289 & 202104326
- NEW 3200 SF PREFAB METAL BUILDING CONSISTING OF A CUSTOMER INTERFACE, OFFICES, RESTROOM/BREAK ROOM, DISASSEMBLY & STOR.
- PHASED APPROVAL FOR 1) METAL FRAMING & SHEETROCK & 2) 3 UNDE R SLAB DRAINS. REFER TO MAIN PERMIT 202205223
- REPLACE DAMAGED STEEL COLUMN
