Maple Ford Park Pavilion Enclosure
Sector: Commercial • Location: Waverly, Georgia, United States of America
Source: Dodge USA
Main pavilion renovation (Demo, framing, insulation, siding, drywall, electrical, doors, locks) $ Store Front Windows $ Kitchen renovation (cabinets, countertops, stove, commercial vent hood, demo and installation of new vent, pass through door repair) $ Kitchen door to outside with lock, 10 x 10 patio with ADA access $ 5-ton AC unit, duct work, and vents $ Sidewalk repair and entrance to building
- Status
- Closed
- Sector
- Commercial, Car parking, Power Generation (CCGT), Automotive, Government, Residential, Manufacturing (Industrial)
- Location
- Waverly, Georgia, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Maple Ford Park Pavilion Enclosure
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Main pavilion renovation (Demo, framing, insulation, siding, drywall, electrical, doors, locks) $ Store Front Windows $ Kitchen renovation (cabinets, countertops, stove, commercial vent hood, demo and installation of new vent, pass through door repair) $ Kitchen door to outside with lock, 10 x 10 patio with ADA access $ 5-ton AC unit, duct work, and vents $ Sidewalk repair and entrance to building ADA renovation $ New well and well pump with associated plumbing $ Addition of two flood lights ... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Georgia |
City | Waverly |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Commercial, Car parking, Power Generation (CCGT), Automotive, Government, Residential, Manufacturing (Industrial) |
Article published date | 2024-03-25 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Commercial projects in United States of America
- SR 3/US 19 FROM 0.14 MI S OF SR 7 TO HENRY COUNTY LINE
- SR 150 FROM 0.18 MI S OF CR 14/STERLING WELLS ROAD TO SR 47
- SR 61 FM PAULDING COUNTY LINE TO N OF CR 522/OLD ALABAMA RD
- COMMERCIAL DRIVE IN STATHAM
- SR 21 FROM 0.02 MI S OF SR 30 TO 0.24 MI S OF NS 916917C
- SR 155 FROM JONESBORO ROAD TO DEKALB COUNTY LINE
- SR 400 @ CR 9284/WINDWARD PKWY
- SR 49 FROM BIBB COUNTY LINE TO BALDWIN COUNTY LINE
