Maple Hill Road Reconstruction
Sector: Road • Location: Ontario, Canada
Source: Infrastructure Canada
The project will rehabilitate two (2) kilometres of Maple Hill Road in Powassan, Ontario. The work involves: aligning and raising the road elevation by 0.6 metres; improving drainage through ditching, a culvert replacement and lining an existing culvert; rehabilitating side slopes to enhance stability; and installing new guide rails that meet provincial standards. The project will improve road s
- Status
- Closed
- Sector
- Road
- Location
- Ontario, Canada
- Updated
- 22 Jul 2026
- Source
- Infrastructure Canada
ConstructChat
Ask ConstructChat about Maple Hill Road Reconstruction
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | completed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The project will rehabilitate two (2) kilometres of Maple Hill Road in Powassan, Ontario. The work involves: aligning and raising the road elevation by 0.6 metres; improving drainage through ditching, a culvert replacement and lining an existing culvert; rehabilitating side slopes to enhance stability; and installing new guide rails that meet provincial standards. The project will improve road safety and reliability, prevent annual flooding and washouts of the road, reduce lifecycle costs, and prevent asset failure. |
Original sector | Roads, Bridges and Trade Infrastructure |
Location
Country | Canada |
State | Ontario |
Source
Source | Infrastructure Canada |
URL |
More Details
Record type | Project |
Sector | Road |
Article published date | 2026-05-31 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
