logo

Maple Leaf Foods Processing Plant

Sector: Commercial • Location: Canada

Source: Bird Construction

Project
Unknown

The new Maple Leaf Foods Processing Plant is one of the most advanced food processing plants in North America. The structural steel frame is clad with insulated panels and an interstitial space is located above each of the process areas to house the mechanical and electrical systems. As a Canadian Food Inspection Agency (CFIA) certified meat processing facility, the building is 90% refrigeration a

Project Information FAQ

Project Information

3 Q
The project “Maple Leaf Foods Processing Plant” is an infrastructure initiative in the Commercial sector, located in Canada. Taiyo aggregates data on it from Bird Construction.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

unknown

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The new Maple Leaf Foods Processing Plant is one of the most advanced food processing plants in North America. The structural steel frame is clad with insulated panels and an interstitial space is located above each of the process areas to house the mechanical and electrical systems. As a Canadian Food Inspection Agency (CFIA) certified meat processing facility, the building is 90% refrigeration and freezers. Only the offices, dry ingredient and packaging material areas are tempered. The facility was built to LEED® Silver certification standards. One of the largest challenges the team faced was the phased occupancy. Each phase was delivered as construction of the additional phases continued. Maintaining the CFIA requirements for the active production line while completing the adjacent production facilities was key to the project’s success. Bird coordinated the process equipment installation to ensure all systems were fully coordinated, commissioned and certified.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data