Maple Street Infrastructure Upgrades Phase 1
Sector: Metal • Location: Fredericton, New Brunswick, Canada
Source: Dodge USA
Proposed work includes the supply and installation of approximately, 620 metres of PVC sanitary sewer, 500 metres of storm sewer, 700 metres of ductile iron water main, new storm sewer manholes and catchbasins, reconnection of service laterals, temporary water system, street reconstruction, traffic control and environmental protection.
- Status
- Closed
- Sector
- Metal, Water Supply and Storage, Road, Waste Processing and Treatment, Mass Transit, Government, Rail, Steel, Commercial
- Location
- Fredericton, New Brunswick, Canada
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Maple Street Infrastructure Upgrades Phase 1
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Proposed work includes the supply and installation of approximately, 620 metres of PVC sanitary sewer, 500 metres of storm sewer, 700 metres of ductile iron water main, new storm sewer manholes and catchbasins, reconnection of service laterals, temporary water system, street reconstruction, traffic control and environmental protection. |
Procurement method | |
Budget |
Location
Country | Canada |
State | New Brunswick |
City | Fredericton |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Metal, Water Supply and Storage, Road, Waste Processing and Treatment, Mass Transit, Government, Rail, Steel, Commercial |
Article published date | 2024-02-22 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
