Maputo Port Coal Terminal
The status, timeline and source of this project. A free account opens every field.
Source: World Bank Group
CMR Engineers and Project Managers Ltd. started running Matola coal terminal in Nov. 1993 under a 15-year lease agreement signed in the aftermath of the civil war in Mozambique. Matola had a capacity of handling up to 4 million tons per year, but throughput in 1993 was 200,000 tons. In 1994, thoughput reached 800,000 tons coal and coke. By 2003 coal throughput reached 1.33 million tons.
CMR in
- Status
- Closed
- Sector
- Water Supply and Storage, Seaport, Government, Manufacturing (Industrial)
- Location
- Mozambique
- Updated
- 22 Jul 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about Maputo Port Coal Terminal
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency | |
Company |
Status
Original status | Concluded |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | CMR Engineers and Project Managers Ltd. started running Matola coal terminal in Nov. 1993 under a 15-year lease agreement signed in the aftermath of the civil war in Mozambique. Matola had a capacity of handling up to 4 million tons per year, but throughput in 1993 was 200,000 tons. In 1994, thoughput reached 800,000 tons coal and coke. By 2003 coal throughput reached 1.33 million tons. CMR invested about US$ 4 million in the rehabilitation of handling equipment, but lacked the resources for further investments. In Feb. 1997, CMR sold the facility to African Portland Industrial Holdings, Namibia, owner of the dry bulk facility at Walvis Bay in Namibia, for an undisclosed sum. CFM, the Mozambique transport parastatal, holded 5% of the shares. The contract ended in 2003, when the state awarded a concession for most terminals of Maputo Port (3122). The Maputo Port Coal Terminal management contract continued to be active after 2003, but was no longer between the state and a private operator, it became a contract between two private entities. None None |
Original sector | Transport |
Procurement method |
Location
Country | Mozambique |
Source
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Seaport, Government, Manufacturing (Industrial) |
Article published date | 2024-09-20 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in Mozambique
- Mozambique - Drought Recovery and Agriculture Resilience Project (DRARP)
- Mozambique - Massingir Dam Emergency Rehabilitation Project Supplementary Loan II (MDERP-SLII)
- Integrated Water Supply and Sanitation Project
- Aguas de Mocambique (Beira, Quelimane, Nampula, and Pemba)
- Mozambique - The Massingir Dam Emergency Rehabilitation Project
- Mozambique - Urban Water Supply Sanitation and Institutional Support Project
- MOZAL S.A.R.L.
- Central Térmica de Temane
