Marathon Community Park - Basketball Court Resurfacing
The status, timeline and source of this project. A free account opens every field.
Source: Dodge USA
Scope - The Project includes Materials, Labors and Equipment for Resurface three (3) asphalt basketball courts, in one battery, measuring 200 x 90 . Sand one (1) set of hockey lines and four (4) sets of pickleball lines, to prevent ghosting through the new surface. Pressure clean to remove mildew and flood entire surface; patch low areas greater than +/- 1/8" and cracks wider than +/- 1/16"; apply
- Status
- Prospective
- Sector
- Energy Storage, Car parking, Road, Automotive, Government, Commercial, Manufacturing (Industrial)
- Location
- Marathon, Florida, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Marathon Community Park - Basketball Court Resurfacing
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Bidding |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Scope - The Project includes Materials, Labors and Equipment for Resurface three (3) asphalt basketball courts, in one battery, measuring 200 x 90 . Sand one (1) set of hockey lines and four (4) sets of pickleball lines, to prevent ghosting through the new surface. Pressure clean to remove mildew and flood entire surface; patch low areas greater than +/- 1/8" and cracks wider than +/- 1/16"; apply 4 coat acrylic color system, including 2 coats of Laykold acrylic resurfacer, 2 coats of Tropico... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Florida |
City | Marathon |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Energy Storage, Car parking, Road, Automotive, Government, Commercial, Manufacturing (Industrial) |
Article published date | 2024-07-08 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Energy Storage projects in United States of America
- INSTALL ROOF MOUNTED SOLAR PV SYSTEM 9.6 KW 24 MODULES AND 13.5 KWH ENERGY STORAGE SYSTEM N 225A LOAD CENTER
- ROOFTOP SOLAR PV INSTALL. (8) 400W MODULES AT 3.2 KW TOTAL. INSTALL (1) (N) ESS TELSA POWERWALL BATTERY AT 13.5 KWH.
- INSTALL ROOF MOUNTED SOLAR PV SYSTEM 7.02 KW 18 MODULES AND 1 CHEM BATTERY AT 9.8KWH
- INSTALL ROOF MOUNTED SOLAR PV SYSTEM 3.78 KW 13.5KH ENERGY STORAGE SYSTEM
- INSTALL (16) TILTED 355W MODULES AT 5.68 KW TOTAL. INSTALL ( 1) TESLA POWERWALL BATTERY AT 13.5 KWH.
- INSTALL TESLA SOLAR ROOF 13.92 KW 27 KWH ENERGY STORAGE SYSTEM NEW 225A DISTRIBUTION PANEL
- ROOFTOP PV SOLAR PANEL INSTALL (21) 400W MODULES AT 8.4 KW T OTAL. INSTALL (1) LG CHEM BATTERY AT 9.88 KWH CAPACITY
- ROOFTOP SOLAR PANEL INSTALL: (10) 400W MODULES AT 4.0 KW TOT AL. INSTALL (1) LG CHEM BATTERY AT 9.8 KWH CAPACITY.
