logo

Marathon Deep Injection Well Phase I

Sector: Water Supply and Storage • Location: Marathon, Florida, United States of America

Source: Dodge

Project
Bidding

The City of Marathon is installing approximately 5,512 linear feet of 10 DR 11 HDPE piping and 14,866 linear feet of 16 DR11 HDPE piping via directional drill method of installation beginning at the City of Marathon Area 3 Wastewater Treatment Plant (WWTP) located at 4095 Overseas Highway and continues running east ward to the Marathon Area 4 WWTP located at 5601 Overseas Highway where a point of

Status
Prospective
Sector
Water Supply and Storage, Government, Commercial, Waste Processing and Treatment, Road
Location
Marathon, Florida, United States of America
Updated
22 Jul 2026
Source
Dodge

ConstructChat

Ask ConstructChat about Marathon Deep Injection Well Phase I

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Marathon Deep Injection Well Phase I” is an infrastructure initiative in the Water Supply and Storage sector, located in Marathon, Florida, United States of America. Taiyo aggregates data on it from Dodge.

Participants

Not available for this record.

Status

Original status

Bidding

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The City of Marathon is installing approximately 5,512 linear feet of 10 DR 11 HDPE piping and 14,866 linear feet of 16 DR11 HDPE piping via directional drill method of installation beginning at the City of Marathon Area 3 Wastewater Treatment Plant (WWTP) located at 4095 Overseas Highway and continues running east ward to the Marathon Area 4 WWTP located at 5601 Overseas Highway where a point of connection is provided before continuing eastward towards the Marathon Area 5 WWTP. Work includes...

Procurement method

Budget

Location

Country

United States of America (USA)

State

Florida

City

Marathon

Source

Source

Dodge

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Government, Commercial, Waste Processing and Treatment, Road

Article published date

2025-03-03

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project