logo
ProjectPlanned

Marfleet Battery Energy Storage System

Sector: Energy Storage • Location: Marfleet, United Kingdom

Source: Stock Titan

A 60 MW / 120 MWh AC battery energy storage system installation in Marfleet, England, part of a total 420 MWh AC battery energy storage system for Drax Group in the UK. The project includes supply of SolBank 3.0 batteries and long-term operational services under a service agreement. Installation is scheduled to start in Q3 2026.

Status
Prospective
Sector
Energy Storage
Location
Marfleet, United Kingdom
Updated
19 Nov 2026
Source
Stock Titan

ConstructChat

Ask ConstructChat about Marfleet Battery Energy Storage System

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

3 Q
The project “Marfleet Battery Energy Storage System” is an infrastructure initiative in the Energy Storage sector, located in Marfleet, United Kingdom. Taiyo aggregates data on it from Stock Titan.

Participants

Not available for this record.

Status

Original status

planned

Taiyo status

Prospective

Taiyo last update

2026-11-19

Contact

Not available for this record.

Description

Description

A 60 MW / 120 MWh AC battery energy storage system installation in Marfleet, England, part of a total 420 MWh AC battery energy storage system for Drax Group in the UK. The project includes supply of SolBank 3.0 batteries and long-term operational services under a service agreement. Installation is scheduled to start in Q3 2026.

Original sector

Energy

Location

Country

United Kingdom (UK)

City

Marfleet

Source

Source

Stock Titan

URL

More Details

Record type

Project

Sector

Energy Storage

Article published date

2026-04-03

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project