Margam Connection Project
Planned · Wales · Last reported Jul 2025
Source: National Grid Group
The Margam Connection Project involves the expansion of the existing Margam site with a new 275kV gas-insulated substation (GIS) and a second 275kV GIS on Tata Steel's Port Talbot site, connected by an underground cable. This upgrade supports the transition to Tata Steel's new electric arc furnace (EAF) for green steel production and strengthens the local electricity network.
- Status
- Prospective
- Sector
- Power Generation (CCGT), Steel, Metal
- Location
- Port Talbot, Wales, United Kingdom
- Updated
- 22 Jul 2026
- Source
- National Grid Group
ConstructChat
Ask ConstructChat about Margam Connection Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Company |
Status
Original status | planned |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Margam Connection Project involves the expansion of the existing Margam site with a new 275kV gas-insulated substation (GIS) and a second 275kV GIS on Tata Steel's Port Talbot site, connected by an underground cable. This upgrade supports the transition to Tata Steel's new electric arc furnace (EAF) for green steel production and strengthens the local electricity network. |
Original sector | Electricity Transmission |
Location
Country | United Kingdom (UK) |
State | Wales |
City | Port Talbot |
Source
Source | National Grid Group |
URL |
More Details
Record type | Project |
Sector | Power Generation (CCGT), Steel, Metal |
Article published date | 2025-09-16 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
