Margham Gas Storage Project
Sector: Solar • Location: Dubai, United Arab Emirates
Source: Stock Titan
Baker Hughes has secured a multi-year contract with Dubai Petroleum Establishment to provide integrated coiled-tubing drilling services for the Margham Gas storage project. This project aims to enhance Dubai's energy supply stability by enabling switching between natural gas and solar power.
- Status
- Closed
- Sector
- Solar, Natural Gas, Oil and Gas, Power Generation (CCGT)
- Location
- Dubai, United Arab Emirates
- Updated
- 22 Jul 2026
- Source
- Stock Titan
ConstructChat
Ask ConstructChat about Margham Gas Storage Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Company |
Status
Original status | awarded |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Baker Hughes has secured a multi-year contract with Dubai Petroleum Establishment to provide integrated coiled-tubing drilling services for the Margham Gas storage project. This project aims to enhance Dubai's energy supply stability by enabling switching between natural gas and solar power. |
Original sector | Energy |
Location
Country | United Arab Emirates (UAE) |
City | Dubai |
Source
Source | Stock Titan |
URL |
More Details
Record type | Project |
Sector | Solar, Natural Gas, Oil and Gas, Power Generation (CCGT) |
Article published date | 2025-03-31 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
