Marginal Wharf and Breakwater Structure
Sector: Commercial • Location: Moncton, New Brunswick, Canada
Source: Dodge USA
1 PSPC on behalf of Fisheries and Oceans, Small Craft Harbours Branch is preparing the demolition and re-construction of structure 403. The new construction is a Berlin Wall Marginal Wharf which will replace the existing timber crib. 2 The work includes but is not limited to: 1 Mobilization to site. 2 Installation and maintenance of environmental controls required to complete the work. 3 Dredging
- Status
- Closed
- Sector
- Commercial, Forest Products and Packaging, Seaport, Water Supply and Storage, Waste Processing and Treatment
- Location
- Moncton, New Brunswick, Canada
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Marginal Wharf and Breakwater Structure
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | 1 PSPC on behalf of Fisheries and Oceans, Small Craft Harbours Branch is preparing the demolition and re-construction of structure 403. The new construction is a Berlin Wall Marginal Wharf which will replace the existing timber crib. 2 The work includes but is not limited to: 1 Mobilization to site. 2 Installation and maintenance of environmental controls required to complete the work. 3 Dredging of the harbour basin. 4 Fully Demolish Structure 403 pier and partially demolish Structure 403 ma... |
Procurement method | |
Budget |
Location
Country | Canada |
State | New Brunswick |
City | Moncton |
Source
Source reliability | Medium |
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Commercial, Forest Products and Packaging, Seaport, Water Supply and Storage, Waste Processing and Treatment |
Article published date | 2023-05-05 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Commercial projects in Canada
- Site C Worker Accommodation
- Transport and Rescue Squadron Hangar Facility - 19 Wing CFB Comox 442
- Thornwood Residences Phase 2
- Canadian Tire Corporate Office Interior Renovation
- St. Stephen Border Crossing
- Aqsarniit Hotel and Convention Centre
- Safeway Refrigerated Warehouse
- International Brotherhood of Boilermakers Training Centre and Union Hall
