Mari Beach Club / IBUKU
Sector: Hotel • Location: Indonesia
Source: ArchDaily
Text description provided by the architects.The design response to the client's vision to have monumental architecture and landscape run sustainably along with natural materials keywords are eclectic, exotic, and elegant. It looks at the bigger picture of why Bali has become a well-known world tourism destination.THE SITE is situated right at the beach with around 60 m of beachfront and 106m in le
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | closed |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | Text description provided by the architects.The design response to the client's vision to have monumental architecture and landscape run sustainably along with natural materials keywords are eclectic, exotic, and elegant. It looks at the bigger picture of why Bali has become a well-known world tourism destination.THE SITE is situated right at the beach with around 60 m of beachfront and 106m in length. During construction, it was noticed that it used to be a mass graveyard around the Main Bar basement especially.There is a hierarchy upon entrance that is the dome, which gently slopes down into the landscape where the river-like pool flows into the sea. The design process transformed along the way. There were changes in management from Pak Khalid & Bu Justina to Bu Syara Daly; even though both are under Pak Felly, the operators also changed, which led to changes in design requirements during construction, which were adjusted by the clients directly. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
