MARIETTA MULTI USE TRAIL - PHASE 2
The status, timeline and source of this project. A free account opens every field.
Source: Georgia Department of Transportation (GDOT)
This proposed project consists of the construction of a multi-use trail and on-road bicycle routes coupled with sidewalks that are designed to improve bicycle and pedestrian connections between historic downtown Marietta, the CCT Transfer Station, Southern Polytechnic State University (SPSU), Life University and a city park.
- Status
- Closed
- Sector
- Car parking, Education, Road, Government, Automotive
- Location
- Georgia, United States of America
- Updated
- 22 Jul 2026
- Source
- Georgia Department of Transportation (GDOT)
ConstructChat
Ask ConstructChat about MARIETTA MULTI USE TRAIL - PHASE 2
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | complete |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | This proposed project consists of the construction of a multi-use trail and on-road bicycle routes coupled with sidewalks that are designed to improve bicycle and pedestrian connections between historic downtown Marietta, the CCT Transfer Station, Southern Polytechnic State University (SPSU), Life University and a city park. |
Location
Country | United States of America (USA) |
State | Georgia |
Source
Source | Georgia Department of Transportation (GDOT) |
URL |
More Details
Record type | Project |
Sector | Car parking, Education, Road, Government, Automotive |
Article published date | 2024-03-05 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Car parking projects in United States of America
- CS 1081/GREENVILLE STREET @ CSX RAILROAD IN LAGRANGE
- CR 1332/OLD ROSWELL RD FM .20 MI W OF MANSELL RD TO PR 9517
- MIDTOWN CONNECTOR IMPROVEMENTS
- P'TREE IND BLVD PEDESTRIAN CORRIDOR IN CHAMBLEE-LCI PROJECT
- West lake sammamish parkway phase 2
- 124th avenue ne corridor
- 98th avenue se (97th place se) and se 11th street slope stabilization
- School zone beacon replacement project
