logo
ProjectClosed

MARIMBONDO POWER I

One of 10,000+ projects Taiyo tracks in Brazil.

Source: World Bank Group

The Marimbondo hydroelectric plant, with an installed capacity of 1,400 Mw, is the largest power project in the government's investment program. The project to be financed by the proposed loan consists of the Marimbondo hydroelectric plant and approximately 1,400 km of 500 kv and other transmission lines connecting Marimbondo to Rio de Janeiro, plus the installation of two additional 150 Mw turbo-

Status
Closed
Sector
Power Generation (CCGT), Government, Hydro
Location
Brazil
Updated
22 Jul 2026
Source
World Bank Group

ConstructChat

Ask ConstructChat about MARIMBONDO POWER I

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “MARIMBONDO POWER I” is an infrastructure initiative in the Power Generation (CCGT) sector, located in Brazil. Taiyo aggregates data on it from World Bank Group.

Participants

Sponsoring Agency

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The Marimbondo hydroelectric plant, with an installed capacity of 1,400 Mw, is the largest power project in the government's investment program. The project to be financed by the proposed loan consists of the Marimbondo hydroelectric plant and approximately 1,400 km of 500 kv and other transmission lines connecting Marimbondo to Rio de Janeiro, plus the installation of two additional 150 Mw turbo-generator units at the existing Furnas hydroelectric plant. The cost per kw of the Marimbondo plant and transmission system is under $200, which can be considered very low-cost hydroelectric power, especially when taking into account the fact that part of the transmission system will serve other plants as well.

Original sector

(Historic)Electric Power & Other Energy

Location

Country

Brazil

Source

Source

World Bank Group

URL

More Details

Record type

Project

Sector

Power Generation (CCGT), Government, Hydro

Article published date

2025-12-17

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project