Marin Civic Center HVAC System Assessment
Sector: Commercial • Location: California, United States of America
Source: Marin County Department of Public Works (DPW)
Marin County Civic Center air handling units, and supporting HVAC components, are reaching the end of useful life; 96% of AC units are original to the building. The HVAC System Assessment was conducted to determine an overall refurbishment/replacement plan taking into account all equipment as an integrated system. The assessment considered overall cost, energy efficiency as it relates to the Marin
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | closed |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | Marin County Civic Center air handling units, and supporting HVAC components, are reaching the end of useful life; 96% of AC units are original to the building. The HVAC System Assessment was conducted to determine an overall refurbishment/replacement plan taking into account all equipment as an integrated system. The assessment considered overall cost, energy efficiency as it relates to the Marin County Climate Action Plan 2030, and new or retrofit equipment that will meet industry standards for durability and life expectancy. The final report presented a recommended plan and a multiyear capital plan for design and construction. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
More Commercial projects in United States of America
- 2023 Citywide Pedestrian Safety Improvements Project
- Shop 1 Building Replacement
- North Creek Trail Section 4-Phase 2 & 3
- FCS Child Care Project
- Brotman Hall (BH) Suite 377 Renovation
- Fine Arts and Housing Cooling Engineering Study
- JUSTIN and J. LOHR Center for Wine and Viticulture
- William and Linda Frost Center for Research and Innovation
