logo

Marin Veterans’ Memorial Auditorium Seismic Retrofit

Sector: Car parking • Location: California, United States of America

Source: Marin County Department of Public Works (DPW)

Project
Closed

This project seismically retrofitted the Marin Center VMA to mitigate risks to the occupants of facility in the event of a major seismic incident at the site. The improvements were designed to elevate the structural seismic performance to a level that meets the current code standards for life and safety. Project scope included strengthening the theater stage roof diaphragm, strengthening the stage

Project Information FAQ

Project Information

4 Q
The project “Marin Veterans’ Memorial Auditorium Seismic Retrofit” is an infrastructure initiative in the Car parking sector, located in California, United States of America. Taiyo aggregates data on it from Marin County Department of Public Works (DPW).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

closed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

This project seismically retrofitted the Marin Center VMA to mitigate risks to the occupants of facility in the event of a major seismic incident at the site. The improvements were designed to elevate the structural seismic performance to a level that meets the current code standards for life and safety. Project scope included strengthening the theater stage roof diaphragm, strengthening the stage walls, bracing the suspended control room, and bracing the plaster ceilings. In addition, the project included reroofing above the theater stage. While the building has been closed for the Seismic Retrofit project, an Investigative Report was conducted to evaluate the rest of the VMA building structure and systems. The report found ground settling and deficiencies in the building systems.  A subsequent project was identified in order to ensure the VMA is safe for public use when it reopens. The separate project is scheduled to begin immediately following the Seismic Retrofit project, thereby requiring the building to remain closed through at least Fall 2025. Visit the Veterans Memorial Building Systems Upgrades project webpage.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data