Marina Improvements Project Upland Phase 1
Sector: Commercial • Location: Warren, Oregon, United States of America
Source: Dodge USA
he scope of work being considered, but is not limited to, the following: 1. Reconstruct the east end of the upper parking lot for parallel loading parking spaces and relocate ADA parking 2. Widen sidewalks to the existing gangway 3. New pavement and restriping of the parking lot adjacent to the marina building 4. Install new pay station and relocate existing pay station 5. Stormwater improvements
- Status
- Closed
- Sector
- Commercial, Waste Processing and Treatment, Seaport, Car parking, Water Supply and Storage, Road, Power Generation (CCGT), Automotive, Government
- Location
- Warren, Oregon, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Marina Improvements Project Upland Phase 1
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | he scope of work being considered, but is not limited to, the following: 1. Reconstruct the east end of the upper parking lot for parallel loading parking spaces and relocate ADA parking 2. Widen sidewalks to the existing gangway 3. New pavement and restriping of the parking lot adjacent to the marina building 4. Install new pay station and relocate existing pay station 5. Stormwater improvements 6. New electrical connections to pay stations and outdoor outlets 7. Install new hydrant |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Oregon |
City | Warren |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Commercial, Waste Processing and Treatment, Seaport, Car parking, Water Supply and Storage, Road, Power Generation (CCGT), Automotive, Government |
Article published date | 2024-07-29 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Commercial projects in United States of America
- SR 3/US 19 FROM 0.14 MI S OF SR 7 TO HENRY COUNTY LINE
- SR 150 FROM 0.18 MI S OF CR 14/STERLING WELLS ROAD TO SR 47
- SR 61 FM PAULDING COUNTY LINE TO N OF CR 522/OLD ALABAMA RD
- COMMERCIAL DRIVE IN STATHAM
- SR 21 FROM 0.02 MI S OF SR 30 TO 0.24 MI S OF NS 916917C
- SR 155 FROM JONESBORO ROAD TO DEKALB COUNTY LINE
- SR 400 @ CR 9284/WINDWARD PKWY
- SR 49 FROM BIBB COUNTY LINE TO BALDWIN COUNTY LINE
