Marina Pumpling Plant No. 1 Site Improvement

Sector: Commercial • Location: Long Beach, California, United States of America

Source: Dodge USA

Project
Closed

The project will include replacement of pump discharge piping and associated valves and instrumentations; construction of new electrical building to house variable frequency controllers (VFCs), switchboards, control panels and associated electrical equipment; construction of new restroom and ventilation system; concrete repair and installation of PVC liner in existing wetwell; replacement of acces

Status
Closed
Sector
Commercial, Water Supply and Storage, Cement, Power Generation (CCGT), Seaport, Government, Waste Processing and Treatment
Location
Long Beach, California, United States of America
Updated
22 Jul 2026
Source
Dodge USA

ConstructChat

Ask ConstructChat about Marina Pumpling Plant No. 1 Site Improvement

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Marina Pumpling Plant No. 1 Site Improvement” is an infrastructure initiative in the Commercial sector, located in Long Beach, California, United States of America. Taiyo aggregates data on it from Dodge USA.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The project will include replacement of pump discharge piping and associated valves and instrumentations; construction of new electrical building to house variable frequency controllers (VFCs), switchboards, control panels and associated electrical equipment; construction of new restroom and ventilation system; concrete repair and installation of PVC liner in existing wetwell; replacement of access hatches; installation of security fence, camera and lighting.

Procurement method

Budget

Location

Country

United States of America (USA)

State

California

City

Long Beach

Source

Source

Dodge USA

URL

More Details

Record type

Project

Sector

Commercial, Water Supply and Storage, Cement, Power Generation (CCGT), Seaport, Government, Waste Processing and Treatment

Article published date

2024-06-24

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project