Mariner East Project, Pennsylvania

Sector: Cable car • Location: Thailand

Source: Hydrocarbon Technology

Project
Closed

The Mariner East Project is a pipeline, processing and export project constructed in three phases; Mariner East 1, Mariner East 2 and Mariner East 2X, by Sunoco Logistics Partners (now Energy Transfer Partners). The project covers a total area of 19 acres and is developed to transport natural gas liquids (NGLs) such as propane, ethane and butane from the Marcellus and Utica shale regions in Weste

Project Information FAQ

Project Information

3 Q
The project “Mariner East Project, Pennsylvania” is an infrastructure initiative in the Cable car sector, located in Thailand. Taiyo aggregates data on it from Hydrocarbon Technology.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

closed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The Mariner East Project is a pipeline, processing and export project constructed in three phases; Mariner East 1, Mariner East 2 and Mariner East 2X, by Sunoco Logistics Partners (now Energy Transfer Partners). The project covers a total area of 19 acres and is developed to transport natural gas liquids (NGLs) such as propane, ethane and butane from the Marcellus and Utica shale regions in Western Pennsylvania, West Virginia and Eastern Ohio to the Marcus Hook Industrial Complex (MHIC), located in Southeastern Pennsylvania. NGLs are processed, stored and chilled at the MHIC, and further distributed to local, domestic and international customers. The MHIC serves as an off-take outlet for the Mariner East 1 pipeline system. The project was announced in 2012 and the first transport of ethane from Mariner East 1 was accomplished in December 2014, whereas the first transport of propane from the pipeline was achieved in March 2016. Construction works for Mariner East 2 began 2017 and the project came online in December 2018. Overall investment in the Mariner Phase 2 project is approximately $2.5bn. The Mariner East 2X pipeline is expected to be operational by the end of 2019. The Mariner East 1 underground pipeline originates from Markwest Energy Partner’s Houston Processing and Fractionation Complex and terminates at the MHIC. The pipeline is approximately 300 miles (482km)-long and incorporates 8in diameter pipes, except for the 51 mile (82km) stretch between Washington County and Westmoreland County, where 12in diameter pipes are used. Mariner East 2, also known as the Pennsylvania Pipeline Project, originates from the processing and fractionation complexes in Ohio, West Virginia and western Pennsylvania, and terminates at MHIC. The underground pipeline follows the Mariner East 1’s right-of-way and integrates 20in diameter pipes. It is 350 mile (563km)-long, stretching 23.6 miles (38km) in Chester County and 11.4 miles (18.3km) in Delaware County. Current designed capacity for Mariner East 1 is 70,000 barrels per day (bpd), whereas the designed capacity for Mariner East 2 is 275,000bpd, which could be expanded to 450,000bpd by installing additional pump stations based on future market demands. The Mariner East 2X pipeline system will have a capacity of 250,000bpd. After the commissioning of Mariner Phase 2, the Mariner Phase 1 will be used to exclusively transport ethane. Mariner East 1 is provided with 16 pump stations, three meter sites and 44 valves sites, whereas Mariner East 2 requires no more than five pump stations for the initial phase. The main control centre for the pipeline is located in Sinking Spring near Reading, Pennsylvania. Pipelines are inspected with X-ray technology during the welding phase, provided with protective bonded-epoxy coating and cathodic protection systems, and are monitored with inspection tools known as smart pigs. The Mariner East 2 project also involved the construction of additional facilities at MHIC in order to accommodate the extra capacity. Two propane tanks with a combined storage capacity of 1.5 million barrels, a 600,000-barrel butane tank and a 300,000-barrel ethane tank are installed at the site. Construction methods employed for the installation of the pipelines for both phases are the open-cut method and the drilling method, incorporating either horizontal boring or horizontal directional drilling. In September 2012, Sunoco Logistics Partners signed two separate 15-year agreements with Ineos Europe and Range Resources Corporation. Based on the agreements, Range Resources Corporation became the anchor shipper, whereas Ineos Europe will purchase the ethane produced from the project. An economic impact study completed by Econsult Solutions in January 2018 stated that the Mariner East project will generate approximately $9.1bn in Pennsylvania’s economy and create approximately 57,070 jobs, with earnings of $2.7bn. Flour was contracted to provide project management services during the construction of the terminal facilities at the MHIC under the Mariner East Phase 2 project. The company served as the engineering, procurement and construction contractor for the Mariner East Phase 2 project. Pipes for Mariner East 1 were produced at US Steel’s McKeesport facility in Pennsylvania, and coated at the Durabond facility in Duquesne, Pennsylvania. The air permit application for Mariner Phase 2 project was prepared by Tetra Tech.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data