Marinus Link HVDC Transmission Project
Sector: Power Generation (CCGT) • Location: Hazelwood and Heybridge, Victoria and Tasmania, Australia
Source: 매일경제
The project involves engineering, procurement and construction of a 750-megawatt HVDC transmission system linking the Hazelwood area in Victoria with Heybridge in Tasmania. The system will span 90 kilometers underground and 255 kilometers undersea, enabling stable power transmission while minimizing energy loss between Tasmania, Victoria and mainland Australia.
- Status
- Closed
- Sector
- Power Generation (CCGT), Government
- Location
- Hazelwood and Heybridge, Victoria and Tasmania, Australia
- Updated
- 22 Jul 2026
- Source
- 매일경제
ConstructChat
Ask ConstructChat about Marinus Link HVDC Transmission Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency | |
Company |
Status
Original status | awarded |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The project involves engineering, procurement and construction of a 750-megawatt HVDC transmission system linking the Hazelwood area in Victoria with Heybridge in Tasmania. The system will span 90 kilometers underground and 255 kilometers undersea, enabling stable power transmission while minimizing energy loss between Tasmania, Victoria and mainland Australia. |
Original sector | Energy |
Budget |
Location
Country | Australia |
State | Victoria and Tasmania |
City | Hazelwood and Heybridge |
Source
Source | 매일경제 |
URL |
More Details
Record type | Project |
Sector | Power Generation (CCGT), Government |
Article published date | 2025-12-21 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
