logo
ProjectPlanned

Marion Avenue Bridge Replacement Project

Sector: Bridge • Location: Southington, Connecticut, United States

Source: Patch

The project involves the replacement of the Marion Avenue Bridge in Southington, Connecticut. A public information forum will be held to discuss the project details, including costs and traffic impacts.

Status
Prospective
Sector
Bridge
Location
Southington, Connecticut, United States of America
Updated
22 Jul 2026
Source
Patch

ConstructChat

Ask ConstructChat about Marion Avenue Bridge Replacement Project

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

3 Q
The project “Marion Avenue Bridge Replacement Project” is an infrastructure initiative in the Bridge sector, located in Southington, Connecticut, United States. Taiyo aggregates data on it from Patch.

Participants

Not available for this record.

Status

Original status

Planned

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The project involves the replacement of the Marion Avenue Bridge in Southington, Connecticut. A public information forum will be held to discuss the project details, including costs and traffic impacts.

Location

Country

United States of America (USA)

State

Connecticut

City

Southington

Source

Source

Patch

URL

More Details

Record type

Project

Sector

Bridge

Article published date

2025-03-10

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project