Markbygden Wind Farm
Sector: Raw Materials • Location: Sweden
Source: Energy Digital Magazine
The Markbygden Wind Farm began construction in 2008 by developers Svevind and Enercon. It has three phases encompassing 8 projects with a total of 500 turbines made by both Enercon and GE Vernova. Svevind became part of leading Norwegian utility Statkraft in 2023 after founder Wolfgang Kropp’s team commissioned the project’s five hundredth wind turbine.
- Status
- Under Construction
- Sector
- Raw Materials, Power Transmission, Wind, Power Generation (CCGT)
- Location
- Sweden
- Updated
- 22 Jul 2026
- Source
- Energy Digital Magazine
ConstructChat
Ask ConstructChat about Markbygden Wind Farm
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Company |
Status
Original status | Under Construction |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Markbygden Wind Farm began construction in 2008 by developers Svevind and Enercon. It has three phases encompassing 8 projects with a total of 500 turbines made by both Enercon and GE Vernova. Svevind became part of leading Norwegian utility Statkraft in 2023 after founder Wolfgang Kropp’s team commissioned the project’s five hundredth wind turbine. |
Location
Country | Sweden |
Source
Source | Energy Digital Magazine |
URL |
More Details
Record type | Project |
Sector | Raw Materials, Power Transmission, Wind, Power Generation (CCGT) |
Article published date | 2025-04-13 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
