Marr Ranch Tank 2 Replacement
Pre-design · California · Last reported Aug 2024
Source: Dodge USA
This project would retrofit the 1.75 Million gallon capacity Marr Ranch Tank No. 2. The tank was constructed in 2005 and the Seismic Evaluation of the Waterworks Storage Tank System, conducted by Kennedy Jenks Consultants in 2020, recommends increasing the thickness of the lowest shell ring, increasing anchorage capacity of the tank, and raising the tank roof by 7 feet. It is recommended to retrof
- Status
- Prospective
- Sector
- Consumer Products, Government, Commercial, Raw Materials
- Location
- Simi Valley, California, United States of America
- Updated
- 19 Nov 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Marr Ranch Tank 2 Replacement
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Pre-Design |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | This project would retrofit the 1.75 Million gallon capacity Marr Ranch Tank No. 2. The tank was constructed in 2005 and the Seismic Evaluation of the Waterworks Storage Tank System, conducted by Kennedy Jenks Consultants in 2020, recommends increasing the thickness of the lowest shell ring, increasing anchorage capacity of the tank, and raising the tank roof by 7 feet. It is recommended to retrofit the tank to meet the current seismic code requirements to ensure the reliability of the system... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | California |
City | Simi Valley |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Consumer Products, Government, Commercial, Raw Materials |
Article published date | 2024-08-26 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Consumer Products projects in United States of America
- MIDTOWN CONNECTOR IMPROVEMENTS
- 98th avenue se (97th place se) and se 11th street slope stabilization
- REMOVE AND REPLACE FENCE, INSTALL ANTENNAS, POWER TRUNKS, RECTIFIERS, BREAKER AND BATTERY STRINGS
- CONVERT (E) DETACHED PERMITTED WORKSHOP INTO NEW ADU, INSTALL (N) FURNACE & TANKLESS W.H,RELOCATE (E)100A SUBPANEL
- WMATA Orange and Blue Line Rehabilitation
- Lake Nona Middle School
- Armature Works
- Anaheim Regional Transportation Intermodal Center
