MARS HILL RD FM CR 274/HOG MTN RD TO SR 8/SR 316 - PHASE I
Sector: Bridge • Location: Georgia, United States of America
Source: Georgia Department of Transportation (GDOT)
The proposed project consists of the widening and reconstruction of Mars Hill Road/CR 264 beginning at CR274/Hog Mountain Road and extending northward to SR 8/SR 316 for a total of 3.09 miles. This project is the first phase of three. Along this corridor which has a posted speed limit of 45 MPH the existing typical section is a two lane roadway with variable width, grassed shoulders. These roadw
- Status
- Closed
- Sector
- Bridge, Commercial, Road, Education, Car parking, Residential, Automotive
- Location
- Georgia, United States of America
- Updated
- 22 Jul 2026
- Source
- Georgia Department of Transportation (GDOT)
ConstructChat
Ask ConstructChat about MARS HILL RD FM CR 274/HOG MTN RD TO SR 8/SR 316 - PHASE I
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | complete |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The proposed project consists of the widening and reconstruction of Mars Hill Road/CR 264 beginning at CR274/Hog Mountain Road and extending northward to SR 8/SR 316 for a total of 3.09 miles. This project is the first phase of three. Along this corridor which has a posted speed limit of 45 MPH the existing typical section is a two lane roadway with variable width, grassed shoulders. These roadways provide primary access for the residential communities northwest of Watkinsville to and from SR 316 and the major shopping and employment centers in Clarke County, including the University of Georgia and nearby Athens. The proposed construction will provide a four lane urban roadway, with two 12’ lanes in each direction, a 20’ raised, grassed median, 4’ bicycle lanes, and 5’ sidewalks on each side. The shoulder will be 16’. The existing bridge over Barber Creek will be replaced to accommodate the new lanes. |
Location
Country | United States of America (USA) |
State | Georgia |
Source
Source | Georgia Department of Transportation (GDOT) |
URL |
More Details
Record type | Project |
Sector | Bridge, Commercial, Road, Education, Car parking, Residential, Automotive |
Article published date | 2026-04-01 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Bridge projects in United States of America
- Centennial Bridge
- Claflin University Connecting Minority Community Project
- ConnectMaine Authority Statewide Broadband Infrastructure Application 2021
- White Earth NTIA Broadband – White Earth Reservation
- Tri-State Fiber Deployment Project (TSFDP)
- OLLU Connecting Minority Communities Pilot
- Strengthening Broadband Capacity to Amplify Educational Opportunities and Foster Digital Inclusion in Rural and Underserved Communities
- Connecting Minds & Technology: Enhancing Cross-Campus Digital Literacy with Hands-on Initiatives (CMT)
