logo

Marshall Gulch Picnic Area & Trailhead Renovation

Sector: Mass Transit • Location: Tucson, Arizona, United States of America

Source: Dodge

Project
Closed

Work primarily consists of the construction of a 1,100-foot-long single-lane asphalt road with 32 roadside parking spaces and installation of two precast and prestressed beam bridges. The bridge designs are 64 and 76 feet long, both 30 feet wide with clear heights of approximately 8 feet. Additional items include relocating a CXT vault restroom, constructing new and demolishing old picnic areas, i

Status
Closed
Sector
Mass Transit, Commercial, Bridge, Road, Rail, Car parking, Automotive, Manufacturing (Industrial)
Location
Tucson, Arizona, United States of America
Updated
22 Jul 2026
Source
Dodge

ConstructChat

Ask ConstructChat about Marshall Gulch Picnic Area & Trailhead Renovation

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Marshall Gulch Picnic Area & Trailhead Renovation” is an infrastructure initiative in the Mass Transit sector, located in Tucson, Arizona, United States of America. Taiyo aggregates data on it from Dodge.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Work primarily consists of the construction of a 1,100-foot-long single-lane asphalt road with 32 roadside parking spaces and installation of two precast and prestressed beam bridges. The bridge designs are 64 and 76 feet long, both 30 feet wide with clear heights of approximately 8 feet. Additional items include relocating a CXT vault restroom, constructing new and demolishing old picnic areas, installing new and removing old culverts, removing retaining walls, reconstructing a small channel...

Procurement method

Budget

Location

Country

United States of America (USA)

State

Arizona

City

Tucson

Source

Source

Dodge

URL

More Details

Record type

Project

Sector

Mass Transit, Commercial, Bridge, Road, Rail, Car parking, Automotive, Manufacturing (Industrial)

Article published date

2025-09-22

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project