Marshalls Creek Bridge Replacement
Sector: Road • Location: Wagga Wagga, New South Wales, Australia
Source: Infrastructure Magazine
The project involves replacing the existing two-lane Marshalls Creek Bridge on the Sturt Highway through Wagga Wagga with a wider four-lane structure. It aims to improve traffic flow by eliminating bottlenecks and provide safer pedestrian and cyclist access with dedicated paths on both sides of the new bridge. Construction will be staged over two years to minimize traffic disruption.
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | under construction |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | The project involves replacing the existing two-lane Marshalls Creek Bridge on the Sturt Highway through Wagga Wagga with a wider four-lane structure. It aims to improve traffic flow by eliminating bottlenecks and provide safer pedestrian and cyclist access with dedicated paths on both sides of the new bridge. Construction will be staged over two years to minimize traffic disruption. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
