Marshalltown New 6 MGD RO Membrane Process Train
Sector: Water Supply and Storage • Location: Marshalltown, Iowa, United States of America
Source: Dodge
Construction of a new 6 MGD Reverse Osmosis (RO) Treatment Process Train at the Marshalltown Water Works existing treatment plant site and north to Sand Road, including a detention basin, water treatment buildings, dual0media gravity filters, installation of a pre-procured RO membrane system, water treatment chemical storage and feed systems, site piping, additional high service pumping, and elect
- Status
- Closed
- Sector
- Water Supply and Storage, Mass Transit, Government, Road, Chemical (Industrial), Power Generation (CCGT), Waste Processing and Treatment, Rail, Commercial, Manufacturing (Industrial)
- Location
- Marshalltown, Iowa, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Marshalltown New 6 MGD RO Membrane Process Train
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | bid results |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Construction of a new 6 MGD Reverse Osmosis (RO) Treatment Process Train at the Marshalltown Water Works existing treatment plant site and north to Sand Road, including a detention basin, water treatment buildings, dual0media gravity filters, installation of a pre-procured RO membrane system, water treatment chemical storage and feed systems, site piping, additional high service pumping, and electrical work and instrumentation and controls associated with the new water treatment equipment. Th... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Iowa |
City | Marshalltown |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Mass Transit, Government, Road, Chemical (Industrial), Power Generation (CCGT), Waste Processing and Treatment, Rail, Commercial, Manufacturing (Industrial) |
Article published date | 2025-08-18 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
