Marston Rd to Saint Jude St Sewer Line Improvements
Sector: Water Supply and Storage • Location: Greensboro, North Carolina, United States of America
Source: Dodge USA
This is a sewer master plan project to upsize the existing 24 27-inch outfall to a 36-inch outfall. The total project length is 5,146 feet, and extends from MH 17862 to MH 14005. Sewer improvements are needed to improve line capacity to handle the wet weather flows from a 10-year frequency, 24-hour duration storm event to help avoid sanitary sewer overflows. The City of Greensboro may be seeking a
- Status
- Prospective
- Sector
- Water Supply and Storage, Government, Waste Processing and Treatment, Commercial
- Location
- Greensboro, North Carolina, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Marston Rd to Saint Jude St Sewer Line Improvements
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Pre-Design |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | This is a sewer master plan project to upsize the existing 24 27-inch outfall to a 36-inch outfall. The total project length is 5,146 feet, and extends from MH 17862 to MH 14005. Sewer improvements are needed to improve line capacity to handle the wet weather flows from a 10-year frequency, 24-hour duration storm event to help avoid sanitary sewer overflows. The City of Greensboro may be seeking a consultant to prepare a Marston Rd to Saint Jude St Sewer Line Improvements Design |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | North Carolina |
City | Greensboro |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Government, Waste Processing and Treatment, Commercial |
Article published date | 2024-09-30 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
