Martin County Beach Nourishment Project
One of 10,000+ projects Taiyo tracks in Florida.
Source: Dodge
A beach nourishment project to replenish sand along about 4 miles of beach between Martin-St. Lucie County and Stuart Beach. The project aims to protect infrastructure, including roads and utilities, and occurs every eight years. It will also benefit the local environment and wildlife. Professional services related to the Bathtub Beach / Sailfish Point Beach Nourishment project. Work includes desi
- Status
- Closed
- Sector
- Manufacturing (Industrial), Power Transmission, Government, Road, Power Generation (CCGT), Commercial
- Location
- Stuart, Florida, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Martin County Beach Nourishment Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | construction documents |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | A beach nourishment project to replenish sand along about 4 miles of beach between Martin-St. Lucie County and Stuart Beach. The project aims to protect infrastructure, including roads and utilities, and occurs every eight years. It will also benefit the local environment and wildlife. Professional services related to the Bathtub Beach / Sailfish Point Beach Nourishment project. Work includes design, permitting, performing baseline environmental and engineering investigations and analysis, pr... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Florida |
City | Stuart |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Manufacturing (Industrial), Power Transmission, Government, Road, Power Generation (CCGT), Commercial |
Article published date | 2025-09-29 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Manufacturing (Industrial) projects in United States of America
- SR 75 FROM SR 2 TO NORTH CAROLINA STATE LINE
- SR 20 FM PRESTON HILLS/LAUREL DR TO CR 715/REYNOLDS RD
- STRUCTURAL STEEL FABRICATION AND ERECTION
- SR 10 FROM CR 107/NORTH LEG DRIVE TO CR 2485/HALE STREET
- CS 493/INDUSTRIAL BLVD FROM SR 19 TO SR 31 - TIA
- SR 19;SR 23; SR 26 & SR 204 @ 9 LOCS - BRIDGE PRESERVATION
- PAULDING COUNTY ITS SYSTEM EXPANSION - PHASE II
- West lake sammamish parkway phase 2
